The Olds’ Shed

My folks made the big move to a new place this year.  Part of the requirement for the new place was a new shed, and the build has commenced.

Given how long I had to wait for mine to be built (and all the planning approvals etc that were required), this has been a comparatively short road (but I bet it hasn’t felt like that!)

The floor area is huge – benefit of having a much larger slice of land, and being in rural New Zealand!

This slideshow requires JavaScript.

Can’t help thinking that it needs another storey 😉  Imagine the machinery layout you could achieve with that sort of shed footprint!

Stu’s Fair Dinkum Shed, 12 months on

But first, a bit on the past year to start.  After a promotion at work, time became even shorter than normal, which was reflected in the posting rate – especially in the second half of the year.  Hoping to improve that this year, and although I don’t expect to be able to achieve a post a day (which would be ideal!), I still hope to achieve at least 200 posts throughout the year, so something like 2 in every 3 days or so.

I still have two magazines to feed content to, so if you want some of the longer, build-oriented articles, they are in the pages of ManSpace magazine, and The Shed magazine.  There will still be build articles here as well of course, but magazines do add to the cash flow 🙂 Videos on the other hand are still the forte of the web, and what this site was originally set up for.  I am expecting a lot more video content to be made available this year, especially with the increasing maturity of my setup.

The main improvement that I want to bring in this year is video lighting.  The setup has good audio and video capture (2 cameras, plus a GoPro, and 2-4 Rode mics), but the lighting is yet to be addressed.  Stills photography is as well taken care of now as I can afford – decent 24MP camera, Zeiss lens and top of the line flash, but this will not be so apparent in the web content (99% of that resolution goes to waste on the web!)

And so to the shed.

It has been a really big 12 months, being just past the first anniversary of the new shed.  I thought I should look at the shed itself, and how it has held up in the first year.

The construction was completed 12 months ago as I mentioned, and before any equipment was moved in, the floor was given an epoxy coating using Shield-crete from Globak Woodcare.

Shed-12

So what do I think, 12 months on?  Other than the above photo having quite a bit of surface sawdust from a current project, the floor still looks awesome.  It has held up excellently, despite having heavy machinery dragged over it, things dropped on it, spilled on it, glue dripped on it.  Sure there are some marks on the surface where I have dragged large machines, but I could probably scrub them off if I could be bothered (it is a shed floor after all).  A few scratches that no surface would have resisted (not that I remember where they are, and they are not apparent even so), and a couple of areas that are chipped, but that is because what fell damaged the concrete underneath.  The surface itself is still fully adhering to the concrete, so my preparation and application was obviously appropriate!

In hindsight, I might have used a few less of the paint chips (my application wasn’t as even as I should have been), and I would have used a bit more of the antislip in the glaze finish.  In saying that, the surface is fine underfoot whether clean, dusty or wet.  Keeping it clean is easy, either with the dust collector, or a compressed air sweep (or the occasional broom). I might have gone with a darker shade, but that is purely aesthetics.

The shed construction has held up to the first 12 months without an issue – it is every bit as robust as it looks.

Shed-10 Shed-15

Those beams are solid!  The shed has had a few high wind days – not enough to really put it to the test, but there have been no signs of issue with what it has survived to date.  It is a superb structure – puts those lightweight sheds right in their place.  Granted there is a significant cost difference.  It is worth it.

The mezzanine has worked out well too – I haven’t managed to collapse it, and it is still storing a lot of gear up there.  No, sadly, I still haven’t finished unpacking.  That will be a work in progress for the next few years I suspect!

Shed-5 Shed-8

The attic stairs have been a good decision, as well as the crane and hoist.  I still need to lower the stairs a couple of inches – I’ll get to it one day.  Having a good amount of storage space has helped keep the main shed floor clear and available for the working machines.  Having a wood store alongside has been great as well, and although having access from inside the shed would have been better, it is a working solution.

Insulation.

Having a shed with insulation is significantly better than one without, but still, on particularly hot and or humid days, it is not the nicest place to work.  The standard insulation could really do with being kicked up a notch, or three.  I’m hoping to get some air con working in there at some stage, as well as a working pot belly for winter.  The temperature extremes (not that they are exceptionally extreme in Melbourne) is enough to be detrimental to the shed experience, so more work required in that area.

It really wasn’t installed very professionally – rough and messy at the edges, and the tape was slapped on rather than applied properly, so that has been coming adrift in places during the year.

Lighting.

As much as possible, and then add more.  The lighting I have, which is a really comprehensive grid of fluoros (2 per unit) is only just sufficient.  Once I replace the tubes I should get a better result.  Not that what I have there isn’t good, but there is room for improvement.

There are two areas where the design and/or construction is less than perfect.

1. Water leaks.

The windows on the mezzanine, and the roller door both let water in.  While the roller door could have been improved by having the slab slope away from the door, it would have been too risky to have that done before the shed went in, in case it wasn’t quite in the right place. I could grind it away after the fact, but a. it would look messy, and b. it would wreck the floor coating.  The bottom of the door doesn’t seal sufficiently against the concrete, especially in the corners.

The mezzanine windows are more of a problem.  Whether they are not well made, or not installed correctly I don’t know to say.  But any half decent rain with a bit of wind, and there is a bit of a waterfall.

Possibly the gaps have something to contribute.

 

Shed-3

Not very clear in the photo, you can just see light coming in at three of the five corners, and the other two are not immune either.  I have to silicone them up.  In saying that, I now do remember that I wasn’t confident on how the top corner of the roof ridge was finished, rain might be coming in there and running down the insulation, making the window look like it is leaking.  Again, it all points to poor assembly.

Shed-13

The other area that should be better is

2. The door.

Shed-14

I added the insulation to the door btw, which was a good move.  Not only decreasing a significant amount of heat that was coming through the door, but also makes it sound a lot less tinny when it shuts. (I would like to stop so much heat coming through the roller door too, if I knew a solution for that).

The door though – the lock/handle mechanism comes loose after a time, needing to be tightened.  And the door scrapes more and more over time on the jamb.  This is most likely because the frame holding the door is too flimsy, and bends a bit more each time the door is opened, especially if opened too far.  There is no active stop on the door to prevent it opening too far, putting pressure on the hinges and the surround, nor is there anything to stop the door slamming shut if blown by a light breeze.  Both of these can be rectified obviously.  But it should be part of the design, not an aftermarket feature that needs to be added.  Given the quality of the rest of the build, this is a small area which lets the otherwise near perfect score down.  Still, the door is 1000% better than the tin shed doors on the clip-together sheds that are out there.Shed-11

Extra features added:

Compressed air – RapidAir setup from Professional Woodworkers Supplies.

Having air piped all around the workshop is awesome.  I never have to think where the closest air supply is – they are all to hand anywhere in the workshop.

The system does bleed a tiny bit of air, so when charged it does add a tiny amount to the background noise, and it doesn’t stay fully charged without the compressor topping up the pressure occasionally.  Not a big problem, unless I forget to turn off the air compressor – sure the neighbours love to hear it kick in, in the middle of the night!

Electrical

People scoffed at the number of GPOs I put in.  Not only have I been vindicated, in a couple of areas I could do with even more!  The shed needed the number of points I put in – it was not a wasted effort (or money).  A couple more 15A points would not have gone astray either. (And although I still would love to have 3 phase, it isn’t proving a particular restriction, although I have had to let a couple of machines pass me by that would have been great purchases)

Dust Extraction.

Shed-9

The system seems to be working ok – manual blast gates are ok, and a lot cheaper than an automated system, but it is an extra step that has to be set up each time a machine is used.  Having the extractor on the mezzanine is also ok – it is causing quite a dust issue up there from a few leaks that have happened, so containing the extractor would still be a good move.  It is still in the way a bit of the stairs, and 2HP is underpowered for the size of the runs I have.  But it is coping to a certain degree – filled another bag just with the work done yesterday and today, so at least that is sawdust that is not all over the shed floor.  A bigger extractor would be preferable.

There are still areas needing improvements out there – a long (never ending) list.

The main ones (that I can think of at the moment):

Sell the TS10L tablesaw.  It is in the way, and not being used.  Same with a few other items, such as a Triton Router Table and some other Triton accessories

Upgrade the drum sander

Upgrade the drill press

Upgrade the linisher/disk sander

Add a spindle moulder

The Triton routers (primarily the one in the router table) could do with an upgrade at some stage.  Initially, the speed controller is pretty much dead and needs replacement.

Create a blade storage (tablesaw and bandsaw blades)

Shed-6

Make a better clamp storage

Shed-7

Find a more permanent home for the 3D printer, and the soon to arrive (hopefully!) CNC router

Shed-2

All in all, the shed is very functional, and plenty of things are being made out there, never as often as I’d like, but I can create something in a weekend pretty easily, from toys to furniture and everything in between.  And after all, a shed is a living space.  The day there is not something to improve, change, add, is the day the door is shut and locked forever.

The other addition 12 months ago was the SawStop tablesaw.  What an amazing machine that is.  The build quality is superb, it is a pleasure to use (and I just ran another 1/2 a km of timber through it today), and still that safety mechanism sits there quietly in the background.  I have the wheel kit to add to the saw which I really need to do asap, and I have one of their titanium blades to try out as well.  I definitely want to add the overhead dust extractor to it, and I can’t wait for the sliding table to become available!  Could have really used it today.

Saw-1

So that is the Fair Dinkum shed, 12 months on.  Overall, it is a solid tick of approval.  The shape works, even though it was a compromise for the shape of the block of land.  More floor space is always better, but that is always the trade-off. The mezzanine is a definite boon, and has really contributed to the shed remaining functional.

Shed-1A great home for Stu’s Shed.

Here’s to 2015, and what should be a great year ahead!

Classic House

Watching an old episode of “House” and came across the following quote.  Seemed too good not to share!  From the episode “Clueless”, Season 2.

 

[Wilson is flipping through House’s TiVo selections]

Dr. James Wilson: Now, why do you have a season pass to The New Yankee Workshop?

Dr. Gregory House: It’s a complete moron working with power tools, how much more suspenseful can you get?

 

Ah, the good old days, when there was still some woodworking content on the pay-TV channels.  Seems to have taken a bit of hiatus.

Speaking of having taken a hiatus, things have been a bit quiet around here as well. Short story is simply – I needed a bit of a break.  Getting to the end of the year is always a real push, and last year was certainly no exception, and when it all piles on, the website gets squeezed for time and mental space.

After the typical chaos of Christmas, the family headed to Echuca-Moama for a week, which has been a chance to recharge the batteries somewhat.  43C days are not always the most relaxing, but the time out was good.

Been out in the shed this afternoon, blowing out some figurative, and literal cobwebs.  A combination of getting the tools working, and the grey tool between the ears.

I was making some test pieces for the next “The Shed” magazine article that I will be working on over the next 3 days. It involves a particularly long tambour door in a rather different way (as in, it is definitely not a door, nor is it designed to slide!)

And time for a reflection on the past year in the new shed.  Yes, it is 12 months ago today that construction of the current shed was finally completed!

 

Commissioned!

With a little more time, and some minor changes to the layout once the dust extractor was relocated to the mezzanine, the dust extraction ducting was finished.

At least the first stage!

Stage 1 – connect up a functional dust extraction run from each of the main machines to the dust extractor, with blast gates isolating each machine.

Further work to be done as time, energy and motivation permits:

Modify base of dust extractor so it fits properly in the available space.  This may also involve shortening the legs by a couple of inches to assist with clearances (to be assessed).

Capture dust from the tablesaw dust guard.

Improve (straighten) path from thicknesser to vertical ducting.

Break into existing ducting to add a run towards the wood turning area.  Includes a pickup from the bench for the bench-mounted tools, and a quick coupling connector for the superflex hosing for cleanups.

Set up extraction as appropriate from the lathes.

Increase diameter of trunking from the dust extractor along the main run to 6″

Add a cyclone separator if possible.

The Super Dust Deputy is $US239, or $A626 for the metal version.

snapz-pro-xscreensnapz001Alternately, the latest version has a standard size, or an XL size for larger HP extractors.

Not sure if and when they will be available in Oz, but they cost $US239 for the XL version, and $US169 for the standard version. It will be interesting to see how the price compares.

super-dust-deputy-regular-and-xl-front-lg

Dusting up a storm

Some further thoughts and developments on the dust extraction system.

I’ve been giving some thought to what happens next – as in how does the dust run get to the dust extractor, and just how far that is – how much more length, how many more bends are required.  The simple answer is “too far and too many”.

Hmm. So the question arose in my mind again – just why did I think the original idea of having the dust extractor on the mezzanine floor was a bad one?  Back in mid Feb, I had thought about it, and opted to bring the dust extractor back down from the mezzanine where it had just been put (and what a pain that was!)  However, now that the machine positions have settled, it is really looking like the mezzanine was a good idea after all.

Looking back at my earlier musing on the subject, I highlighted good points to be
a. free up workshop floorspace
b. for it to be inside the main shed, as it draws a lot of air, and if outside the main shed, that is a lot of hot (or cold) air that would be drawn into the workshop, and
c. as that would make it generally central to the machines it is drawing from.

On the other hand, I had thought having it in the timber store next door gives better access, better noise separation, better workshop air quality (particularly on the mezzanine).

Now that I have been working in the shed for over 1/2 a year, more informed decisions can be made.

These lead to the following justifications for relocating the dust extractor back to the mezzanine:

1. Significantly shorten the length of ducting, and minimises the number of bends required.
2. Noise isolation would be the same as having the dust extractor in the area I currently have placed it.
3. Dust isolation from the main shed is maintained, although the mezzanine will not be as clean, it is not used as I was anticipating. If I ever do start to make use of it for something other than storage, I can look at physically isolating the extractor at that point. It still has a pleated filter, and I can still run an air filtration system up there if I choose.
4. It does not draw air from the outside (hot or cold), so running the dust extractor will not significantly impact on the shed environment
5. Changing bags is as easy (if not a little easier), and I do have the hoist to remove full bags from the mezzanine.

To compare the two locations, let’s take the biggest producer of sawdust in the workshop (which also produces the heaviest particles), being the thicknesser.

With the dust extractor outside in the side shed, it would involve approx 12m of ducting (up, across and down), and a total of 6x 90 degree bends (each elbow is estimated to be the equivalent of 2m of straight pipe), so a total of 24m equivalent length.

With the dust extractor on the mezzanine, it would involve approx 4m of ducting and a total of 4x 90 degree bends (at worst), giving a total of 12m.  That is one significant saving to be had, for the machine that needs the most drawing capacity.  All other machines benefit to lesser degrees, but each ends up saving about 10m in equivalent straight pipe length, if not more.

So I guess that makes the decision an easy one.  The ducting is a lot less complicated, and shorter.  There is power already available (I originally placed a GPO up there to be dedicated to the dust extractor).

The future plan will be to look at continuing to improve and upgrade the dusting system – moving as much up to 6″ ducts as possible, rather than the current 4″.  But let’s see how the system works once I get it up and running, to see just how much that will be a priority.

Onwards and upwards (quite literally!)

SSYTC067 PA Doors

Episode 103 Shed Tour

Finally!  A tour of the shed, warts and all.  It is still a work in progress, but I guess, it will always be somewhat of a work in progress!

Sliced bread? Step aside!

Yet more evidence of the phenomenon that is the Centipede SawHorse – had another job on (cutting some polycarb roof), and again the Centipede absolutely nailed the task.

untitled-1

Needed to cut some sheets at 90º and 45º, and the Centipede’s ability to both support the sheet, and provide plenty of clearance for the tool to make a full depth cut (without having to worry about cutting into the table) was invaluable.

The simplest concept success is the 2×4 support that plug into the holes at the end of each upright.  Absolute genius.  You don’t always need to use them, but for a particularly flexible material, it was the difference between an ok setup, and one that absolutely nailed the task.  I was flicking from left to right on that front length to get the angle cuts I needed, and the flexible sheet was supported all the way along the length of the cut.

untitled-2You can set it up anywhere – I would have done this job out on the grass (even being a bit uneven), but due to a persistent drizzle, found working under the back deck was a good solution.  The Centipede created the working surface in seconds, and was a real asset to the job, not just a bench, or a couple of sawhorses, but actually made the job easier (and therefore achieved a better than expected result).  Can’t tell you how much I love this thing!!

As you can see in the photo, I am using the Festool rail, but instead of using the TS55, I used it with the Dremel, mounted in the plunge router attachment.  I did try the TS55, but without the right blade, I got too much cracking and chipping of the edge.  The dremel with a shear cut bit did the trick.  When I get the Festool router, and attachment to be able to use it on a rail, it will be even better.  The Ti15 impact driver got a really good workout!

So what was it for?  The new dust extraction section of the shed.  It was a trapped corner, between the shed and the (45º) fence, and with a new wall, and roof (polycarb), the outdoor area becomes another internal, sheltered, but separate room.  It provides easy access to the dust extractor, and yet isolates the noise and any leaking dust away from the shed itself.  I’ve now also decided to do a little rerouting of the air system, so the air compressor can go into the same area, again for ease of access.

untitled-3The floor is crushed rock – I will continue to revisit the space, but it is perfectly functional.

And finally, the dust extractor has a home, and one that I can easily route the dust extraction system to it.

Can’t wait to get it all connected up, and back up and running.

Compounding Cuts

Been working over the weekend on cleaning up around the shed.  A little bit of cleaning up after the last project, and a lot of getting some equipment into its final home.

Specifically the dust extractor.

If you remember from my recent floorplan, I am intending on putting it into the ‘dead’ corner caught between the shed and the diagonal fence.  My original idea was to create a bit of a standalone shed around the extractor, but for a number of reasons it is a lot better to resurrect the earlier plan of having the whole section boxed in.  Overall, it results in a loss in usable floorspace, but the floorspace that is available becomes significantly more productive.

It may stop me turning the rest of that corner into a rubbish tip!

The original shed design shied away from producing an angled section to the shed – too difficult to calculate, or manufacture the angled joiners or something.

But not if I am doing it myself. I’m using treated pine for the frame, so I can cut the compound angles easily.  45º side angle, 10º down angle for the roof.  Don’t have to think twice about it on the Kapex.

Getting this sorted, and the rest of the shed more organised meant I didn’t get to shoot the videos I was planning for the weekend.  Things rarely go to plan, but each day is a small step closer to having the shed organised and operational, and each step means when I do shoot video (or take some stills), that things look closer to how I would like them to be.  It also means I am a bit short of content to chat about here, but again, the more progress I make now, the easier it will be down track.

The Ti15 Festool impact driver is really earning its keep, and the TS55 REQ is going to do the same when it comes time to make the angled cuts in the polycarbonate roofing.  As is the Centipede Sawhorse!  You know a winner of a tool, when within days of receiving it, you can’t work out how you did without it.

Storage solutions

I have been looking for additional storage for a while, and came across the Kobalt cabinets in Masters.

Despite being an in-house brand, they seemed pretty good on a number of fronts. Doors were heavy, cupboard depth was generous, and they looked good (and without fake boilerplate).

Still, I ummed and ahhed a bit, and decided to measure the available space, and sleep on it- at $300 for a full cabinet and $170 for a wall mounted one, I wanted to think about it more.

On the way home, stopped for petrol from a Woolworths station, and got a voucher on the receipt for 15% off at Masters. Then, while having a look online, discovered they were now on special- $169 and $149. Hoping they would still have stock, and that I would be able to use the discount voucher as well, I headed on down, and sure enough, got the cabinets I wanted at a really good price.

While doing the very straight-forward assembly, I discovered something else- solid design, and a well thought out assembly method, with understandable instructions.

Screws were preinserted in holes, ready for the final tightening after inserting into the relevant keyhole. That made assembly particularly easy, and quick.

After a bit of a shed rearrangement, I now have this shed setup:

20140422-130214.jpg

Now I just have to figure out what goes where!

As you can see, the bar fridge got relocated as well, and the Walko workbench set up a bit better as well.

20140422-130107.jpg

%d bloggers like this: