With the grace of a gazelle (with clown shoes), the seemingly difficult hurdle of locating the shed on the block has been nimbly leapt over – the Report and Consent has been approved by the local council without any issues requiring to be addressed.
That is huge, as it also paves the way for the actual Building Permit to go through with little issue, given the location and size of the shed having already been considered.
The ducks are finally lining up – just a few more to peg away at and the physical aspects of the shed construction will be able to get underway.
Filed under: Shed | Tagged: Construction permit, Permit and Zoning |
Congratulations! I eagerly wait for the construction.
Believe you-me, so do I!!!!